SlideShow

  • View of framing on the second floor
  • View of a window opening ready for the window install
  • View of the windows that are onsite and waiting to be installed
  • View of the west side of the building
  • View of the water proofing and vapor barrier installed
  • View of the wall framing and sanitary piping installed
  • View of the updated sign
  • View of the underground sanitary piping on the lower level
  • View of the underground sanitary piping in the kitchen area, lower level
  • View of the storm drainage piping installed in the ceiling, second floor
  • View of the storm drain and sanitary piping exiting the building
  • View of the south side of the building
  • View of the second floor bathroom showing the framing and sanitary piping installed
  • View of the installed sanitary piping
  • View of the hallway framing showing the storm drain installed
  • View of the framing on the second floor
  • View of the east side of the building